Falcon Electric reports that a water-quality laboratory traced aborted tests and no-fault errors to unpredictable AC power and selected online UPS protection for sensitive instruments. [1]
Published operating context
The manufacturer source identifies the customer, application and intervention. It is the primary evidence for the project facts. Guidance for another site comes from the separately identified technical references. No manufacturer result is represented as an independent measurement.
The laboratory used computer-controlled systems, gas chromatography and mass spectrometry, microscopy and sensitive measuring devices. [1]

Figure 1: Published case sequence.
Reported challenge
The manufacturer case says earlier offline UPS units did not consistently prevent aborted tests. [1]
Operational risk is not limited to a complete outage. A voltage variation, short interruption, transfer, weakened battery, overload, high temperature or unowned alarm can interrupt the protected function. The first task for a similar project is therefore to measure load, read the event history and name the consequence of interruption.
Published response
Falcon attributes the improved outcome to true online UPS power conditioning, while the public source does not provide a controlled before-and-after event dataset. [1]
The published sequence shows a solution selected for one context. It does not prove that the same rating, model, runtime or architecture fits elsewhere. A new project must confirm voltage, conductors, grounding, bypass, alternate source, clearances, environment and delivery route before purchase.

Figure 2: Evidence boundary.
Engineering qualification for another site
The design register separates known, measured, customer-stated, calculated and unresolved inputs. It covers normal watts and VA, peaks, runtime, power factor, phase loading, generator, temperature, cooling, batteries, communications and the work window. An unknown that changes safety, capacity, runtime or maintainability blocks firm selection.
States to prove include normal operation, source loss, stored-energy support, alternate source, static bypass, maintenance bypass, component isolation and return to normal. For each state, the record names the load path, remaining protection, reserve, permitted duration, alarms, switching authority and rollback condition.
Implementation controls
The purchase record binds the exact model, voltage, rating, batteries, bypass, accessories, network interface, certification, warranty and startup. A substitution requires a dedicated source and a fresh check of every criterion. Custom or non-cancellable equipment receives a separate release gate.
The UPS consultation and installation services can be used to define the survey, commissioning or maintenance scope that must produce this site evidence.

Figure 3: Case-specific decision matrix.
Reported results and measurement limits
The results above are manufacturer-reported. The public source is not an independent audit and may omit load profile, event logs, runtime tests, costs, failures, settings and observation duration. Those omissions do not disprove the published result, but they prevent conversion of that result into a guarantee for another site.
Records to carry forward
The closeout file retains the load survey, as-built one-line, models and serials, battery configuration, settings, firmware, transfer tests, alarms, deficiencies, corrections and final state. It also names the owner for alarms, updates, spares and the next lifecycle decision.
Subject-specific decision register
Four decisions govern this publication: instrument disturbance record, watts, va and inrush by instrument, topology and grounding qualification and aborted-test and power-event correlation. They form a reviewable register instead of a generic checklist. Each row has an input, source, owner, acceptance condition and consequence when evidence is missing.
| Decision | Required evidence | Stop condition |
|---|---|---|
| Instrument disturbance record | A dated log of the power disturbances the instruments experienced (sags, transfers, harmonics) correlated to instrument faults | Hold the diagnosis until the disturbance record is dated and correlated, not anecdotal |
| Watts, VA and inrush by instrument | The watts, VA, power factor and inrush per instrument from the instrument data, and the aggregate per circuit | Do not size the UPS until per-instrument inrush and the circuit aggregate are known |
| Topology and grounding qualification | The UPS topology (online double conversion) and the grounding and isolation scheme qualified against the instruments power-quality requirement | Hold if the topology or grounding does not meet the instruments stated requirement |
| Aborted-test and power-event correlation | The record correlating aborted instrument runs to logged power events, establishing the protective benefit | Keep the deficiency open until aborted runs are correlated to power events and the protection is demonstrated |
The site survey records load, source, room, environment, bypass, delivery route and operating constraints [4]. Calculations and assumptions retain units, load state and source [5]. This connection prevents a catalogue value or a case outcome from becoming the default value for a new installation.
The state register separates normal operation, source loss, stored-energy support, static bypass, maintenance bypass, isolation and return [6]. It states what supplies the load, remaining protection, energized sources, permitted duration, alarms and the point where work must stop.
Monitoring identifies card, firmware, protocols, network segment, accounts, logs and alarm owner [7]. Read-only remains the starting point. A remote command or automated shutdown requires an approved need, dependency map and tested rollback.
Commissioning establishes criteria before testing and retains measurements, events, deficiencies, corrections and final state [8]. The service agreement states response, exclusions, spares, maintenance window, report and next lifecycle decision [9].
The cited GDF field pattern is used only for the comparable-project method [10]. It does not mean that GDF performed the manufacturer case. Customer facts, products, quantities and results remain attributed to the manufacturer source.
Sources
- Falcon Electric, El Paso Water Utilities Laboratory Equipment Protection. https://falconups.com/wp-content/uploads/2-DONE_El-Paso-Water_CaseStudy-Falcon.pdf
- Falcon Electric, How to Select the Right UPS for Scientific and Laboratory Equipment. https://falconups.com/resources/white-papers/how-to-select-the-right-ups-for-scientific-and-laboratory-equipment/
- GDF Technologies internal knowledge library, UPS Engineering Calculations and Independent Design Verification. Local library: UPS Solutions & Quotes/UPS Engineering Calculations and Independent Design Verification.md
- GDF Technologies internal knowledge library, UPS Site Survey and Requirements Capture. Local library: UPS Solutions & Quotes/UPS Site Survey and Requirements Capture.md
- GDF Technologies internal knowledge library, UPS Engineering Calculations and Independent Design Verification. Local library: UPS Solutions & Quotes/UPS Engineering Calculations and Independent Design Verification.md
- GDF Technologies internal knowledge library, UPS Maintenance MOP Safety Boundaries and Go-No-Go Criteria. Local library: UPS Maintenance/UPS Maintenance MOP Safety Boundaries and Go-No-Go Criteria.md
- GDF Technologies internal knowledge library, UPS Monitoring Cybersecurity and Network Integration. Local library: Monitoring, SNMP & Shutdown/UPS Monitoring Cybersecurity and Network Integration.md
- GDF Technologies internal knowledge library, UPS Commissioning and Acceptance Testing. Local library: Installation & Commissioning/UPS Commissioning and Acceptance Testing.md
- GDF Technologies internal knowledge library, UPS Service SLA Design and Coverage Scoping. Local library: Service Contracts & PM Agreements/UPS Service SLA Design and Coverage Scoping.md
- GDF Technologies, GDF Field Case Library: Engineering and Quoting Patterns. Local library: UPS Solutions & Quotes/GDF Field Case Library – Engineering and Quoting Patterns.md
GDF Technologies services every UPS brand covered here, across Canada. See our preventive UPS maintenance plans or call (514) 252-8324 for on site support.